Project Overview

OnLogic is an industrial computer manufacturer located in northern Vermont, where temperatures fluctuate significantly between summer and winter. Their 150,000 square foot corporate headquarters and manufacturing facility achieved an 87% reduction in scope-related embodied carbon by using foamed glass aggregate when compared to using traditional foam-based insulation in their subslab insulation assembly.

Design Challenges

The OnLogic team prioritized the use of sustainable, locally-sourced materials for their new headquarters to align with climate responsibility goals. They needed a well-conditioned, energy-efficient space for employees while maintaining stable temperatures for precision manufacturing. To minimize heating and cooling costs, the building required a high performance envelope that met both thermal performance and environmental goals.

Project goals included:

  • Consistent and stable temperatures for quality control
  • High R-value to minimize heating and cooling loads
  • Minimized embodied carbon without performance sacrifices
  • Locally sourced materials

Rigid foam insulation could meet the thermal requirements needed but risked thermal drift over time and the high carbon impact also conflicted with OnLogic’s sustainability commitments. The design team needed an alternative that delivered performance and environmental impact.

Glavel as a Solution

Foamed glass aggregate was specified at R15 for subslab insulation throughout the 150,000 square foot facility. It replaced rigid foam insulation and crushed stone throughout the slab areas as insulation and drainage, ensuring energy efficiency in the fully electrified building. According to ReArch Construction, the use of foamed glass aggregate resulted in 87% carbon emissions reduction when compared to a traditional insulation assembly.

Project Name
OnLogic
Location
South Burlington, Vermont
Application
Scope Completion Date
September 2023
Volume
2,500 cubic yards
Carbon Savings

Case Studies

Foamed Glass Aggregate being used at the Exit 17 Bridge Replacement
Infrastructure Construction
, Lightweight Fill
Exit 17 Bridge Replacement
Vermont’s Exit 17 Bridge replacement used 12,500 cubic yards of foamed glass aggregate to build bridge approaches over deep clay soils, eliminating the need for costly excavation while preventing long-term settlement in the I-89 corridor.
Featured photo for the OnLogic Case Study
Commercial Construction
, Subslab Insulation
OnLogic
OnLogic’s 150,000 sq ft headquarters achieved 87% embodied carbon reduction by replacing traditional foam insulation with foamed glass aggregate in their subslab assembly.
Foamed Glass Aggregate being used at the Route 28 Bridge Replacement
Infrastructure Construction
, Lightweight Fill
Route 28 Bridge Replacement
A historic bridge through the Adirondack Park near Raquette Lake needed a 12 foot grade change over a sensitive marshland. Foamed glass aggregate delivered a lightweight solution that protected the nearby landscape and eliminated the need for driving piles.
Commercial Construction
OnLogic
OnLogic’s 150,000 sq ft headquarters achieved 87% embodied carbon reduction by replacing traditional foam insulation with foamed glass aggregate in their subslab assembly.